Foundation piles for underpass in A’dam

Foundation piles for underpass in A’dam

New underpass Amstelstroomlaan, AmsterdamFor a large project in Bijlmer (Amsterdam) we supplied no fewer than 112 475 X 10 mm pipes of 24 meters long. We have provided these foundation piles with a drilling point and injection lance, so...

Mooring piles for St. Andries lock

Mooring piles for St. Andries lock

Mooring piles for St. Andries lockWe supplied tailor-made mooring piles for minor hydraulic maintenance to the lock in St. Andries. The maintenance consisted of replacing 9 wooden mooring piles  for 9 steel variants in both outer...

Huge pipes upcycled and reused in Austria

Huge pipes upcycled and reused in Austria

  Huge pipes upcycled and reused for a infraproject in AustriaThese pipes are no less than two meters in diameter. Originally they served as parts for autoclaves in Germany. Swanenberg IJzer Groep bought them cleaned them and made them ready for transport...

Albert cuyp car park, Amsterdam

Albert cuyp car park, Amsterdam

Albert cuyp car park, Amsterdam The Albert Cuyp car park is a unique building project in Amsterdam. The car park will be located under the Boerenwetering canal and will consist of 2 parking levels. For the strut frame, which serves to withstand horizontal...

Handelseweg roundabout in Gemert

Handelseweg roundabout in Gemert

Handelseweg roundabout in Gemert   Last summer we supplied almost 50 tonnes of HEA 340 section beams, commissioned by BAM Infra. The beams were custom made on-site and served as rails for an innovative project: sliding into place a 1.2 million kilo concrete and...